Case study: planning Q4 inventory around Amazon cutoff dates with 5 direct-to-FBA shipments
The situation
Q4 punishes bad inventory planning in both directions. Too little stock and you’re out during peak demand. Too much and you’ve got cash sitting in units that won’t move until January.
We needed a plan that kept inventory healthy without paying for logistics we didn’t have to.
The default route
The default was sending everything through AWD, then moving it from AWD to FBA as needed. It works, but that second leg adds transportation cost and transit time on every unit that takes it.
What we did
We placed the POs in multiple parts and built the shipment schedule around Amazon’s cutoff dates. Then we split the inventory into 5 direct-to-FBA shipments, which cut how much stock had to rely on the AWD → FBA leg.
Each shipment was timed against four things: forecasted demand, current inventory levels, cutoff dates, and replenishment timelines. That’s what decides what goes where and when, so the right stock lands at the right time.
What it changed
Less transportation spend on the AWD → FBA leg, and shorter transit time for the inventory that skipped it. We also have more control over how stock moves, since each of the 5 shipments has its own date and purpose.
The risk of Q4 overstock and stockouts went down, and we’re not tying up capital in excess units to get there.
The takeaway
I think the biggest difference is timing. The plan existed before Q4 started, so we’re scheduling shipments against cutoff dates instead of scrambling after inventory runs low.